Nasva, EstoniaNaval Warfare
Estonia plans launch of Euroguard naval prototype
The 45-metre vessel is intended to test autonomous navigation and remote control from shore. Ten European countries are involved in the project, which has a budget of €95 million.

The experimental naval vessel Euroguard is scheduled to be launched on 18 November 2026 at the Baltic Workboats shipyard in Nasva, on the Estonian island of Saaremaa, Estonian public broadcaster ERR reported. The 45-metre prototype has been developed as a test platform for the next generation of European naval vessels.
This is a developing story and further information may be added.
Ten countries and €65 million from the European Defence Fund
The project is led by Estonia and involves ten European countries and 27 industry partners, Ahto Pärl, a member of the management board of Baltic Workboats, told ERR.
According to ERR, the total budget is €95 million, of which €65 million is provided by the European Defence Fund. This is the project budget, not an announced price for a production vessel. European funding and the involvement of several countries do not mean that they have placed a joint order either.
Euroguard’s intended roles and design specifications
According to the description published by ERR, Euroguard is intended for maritime surveillance, mine countermeasures, critical infrastructure protection, and search and rescue. Its design specifications are a speed of at least 20 knots, a range of at least 2,000 nautical miles and endurance at sea of up to 10 days. These are design targets, not sea trial results.
Autonomous navigation and remote control from shore are planned. These are distinct functions: with autonomous navigation, onboard equipment performs navigational tasks, while under remote control, an operator directs the vessel via a communications link. Having these capabilities does not in itself mean that all missions can be carried out without a crew or human oversight.
Mine countermeasures tasks also require specialised equipment to detect, classify and neutralise mines. The platform’s stated purpose is therefore not enough to assess its effectiveness in mine countermeasures operations.
Launch does not mean operational readiness
In Flank’s assessment, Euroguard is primarily a technology test platform at this stage. Its launch will allow the next checks on the vessel to begin, but does not in itself demonstrate readiness for autonomous or mine countermeasures operations. Sea trial results and demonstrations of control from shore will be decisive in making that assessment.
Further information may be added.
Sources
1 secondary report
Secondary reporting
ERR News (Estonian Public Broadcasting) · news.err.ee
Saaremaa shipyard to launch largest Estonian-built warshipVerified media
Linked to this story
Related topics

Black SeaNaval Warfare
Capsized Khoryv enters Bulgaria’s exclusive economic zone and drifts south
The partially submerged cargo ship has no crew or lights and poses a hazard to navigation. Bulgarian authorities are tracking its movement and preparing an inspection by a Navy vessel.

TürkiyeDrones
Turkish defence technology company HAVELSAN reports test of uncrewed surface vessel with armed aerial drone
According to the company statement, SAGAN took off autonomously from the USV-12 surface vessel and dropped a 60 mm mortar round under operator control. The demonstration shows shared control of two uncrewed platforms but does not establish their combat effectiveness.

BurgasElectronic Warfare
Bulgarian autonomous maritime platform unveiled in Burgas
According to Euronews Bulgaria and Novinite, a locally developed platform for maritime surveillance and protection has been shown at an international forum. Controlled trials in Burgas Bay are planned over the next two weeks, Novinite reports.

Cluj-Napoca, RomaniaDrones
Romanian entrepreneur likely coordinating military drone project worth nearly €11 million
According to HotNews, the project envisages AI-enabled autonomous drones, electronic warfare platforms and hydrogen propulsion. The status of the stated sum is unclear, while the capabilities described remain development plans.